Damage Prevention Solution

West Virginia Specifications & Guidelines

West Virginia Department of Transportation

WVDOH Standard Specifications Roads and Bridges, 2023 Edition

105.2-Plans and Working Drawings

"... It is the Contractor's responsibility to determine the exact location of each utility in project areas where these utilities would be interrupted or damaged by performing work. In the event of damage or disruption to utilities which are active and are to remain in service, the Contractor shall immediately notify the responsible official of the organization operating the utility that is interrupted. The Contractor shall assume all costs, charges or claims connected with the interruption and repair of any utility damaged by the Contractor."

> Open Specification Document

105.6-Cooperation with Utilities

> Open Specification Document

107.17-Contractor's Responsibility for Utility Property and Services

> Open Specification Document

658.5.2-Excavation

> Open Specification Document

Call Before You Dig

West Virginia 811

Call: 811 (Local) or 800-245-4848

Click: https://wv811.com/

Product Approvals

Copyright © 2024 Damage Prevention Solutions, LLC
Privacy Policy
3M Authorized ManufacturerMade in USA of US and Imported Parts