Name*
Email Address*
Phone Number
What Product features are you most interested in?
Preventing Excavation Damages
Options for Open Trench Installation
Options for Boring Installation
Mechanical Protection
Tracer Wire Location
Radiofrequency (RF) Location
Custom Printing
Thank you for your interest in learning more about preventing damages with our products. A member of our sales team will be in touch shortly.
Oops! Something went wrong while submitting the form.
TOLL FREE :
1-800-254-8718
LINKEDIN
INSTAGRAM
youtube
Contact us
Products
SIGNALTAPE
®
WARNING TAPE
TRACETAPE™ DETECTABLE TAPE
BORETRACE™ DETECTABLE TAPE
MarkingTape
Barricadetape
3M™ PathMarking Tapes
RESOURCES
Installation
Research
Purchasing
Videos
LEARN MORE
news and updates
Enhancing Communication with Marker Tape for Buried Utilities
We offer all of our products in APWA colors; the color code provides consistency, but these categories can be somewhat broad.
Preventing Excavation Damage in New Neighborhoods
For utilities often installed first in newly developing areas repeated excavation damages can be problematic.
RF Path Marking Simplifies Continuity Checks
RF path marking can help to save contractors time and money.
Choosing the Right Width of Signaltape® Warning Tape
It's important to use the right product and for warning tape, the right size needs to provide proper coverage over buried lines.
Effective White Lining in Snow: Tips for Safe Excavation
White lining is still important when snow is on the ground.
Fast Custom Marking and Warning Tape
As a manufacturer based in Virginia, we are able to offer relatively short lead times on our custom marking and warning tapes.
Tracetape™ Durable Locatable Marker Tape
Tracetape™ locatable marker tape contains a jacketed tracer wire ...
Identification Material for Bored Utilities
Explicitly marking lines helps to eliminate the chance someone will have to make assumptions about the contents at a later time.
Standard RF Utility Marking Frequencies
Utility marking colors are an industry standard, now path and point marking frequencies are standardized too.
Preventing Damages Before As-Builts are Provided
A common cause of excavation damage during campus projects is that recently buried utilities are not yet recorded in as-builts.
Previous
Next
Subscribe
First Name
Last Name
Email Address
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.